View Petitions

  • Details
  • Signatures
  • Response to Petition
Dereham Road Bus Lane
‘We, the undersigned, petition Norfolk County Council to look and investigate removing the 24hour a day 7 day a week bus lane on dereham road costessey and placing timed use on it as many of the other areas around norwich have, this will allow traffic to move down dereham road more freely so it can turn left onto norwich road, thus resulting in reduced short cutting via Grove Avenue, sunny grove and other small residential streets. We are not asking for the bus lane to be in use at all times but fall in line with other routes eg the bus lane can be used between the hours of 9.30am - 10pm. this bus lane currently has 4 buses per hour and even less at weekends but causes huge traffic tailbacks which have on occassion gone much further down the main dereham road. this bus lane seems to be one of only a handful of 24hour a day 7 days a week bus and taxi only routes. the removing and changing of the timed use will benefit a wide variety of drivers.
Not Specified
Wednesday, 16 September 2020
Friday, 15 January 2021
Gary Blundell
This petition currently has 327 signatures in total.
Petition Signatories
327 electronic signatures
 Page 1 of 33, items 1 to 10 of 327.
- Data Removed -
- Data Removed -
- Data Removed -
- Data Removed -
- Data Removed -
- Data Removed -
- Data Removed -
- Data Removed -
- Data Removed -
- Data Removed -
This petition has been reviewed and the following response has been offered:

Dereham Road is an important public transport corridor into Norwich and up to eight buses per hour use the existing bus lane that is in place, carrying up to 125,000 passengers per month.  It is important to note that the bus lane can also be used by taxis and those cycling, with surveys from October 2019 showing up to 150 people per day cycling towards the city in the bus lane.

There are numerous benefits to bus lanes, which include:

  • Increased bus service reliability;
  • More consistent bus passenger journey times;
  • Encourages greater use of public transport, particularly through a modal shift from car;
  • Enables buses to stop at the bus stops along the route out of the general flow of traffic;
  • Provides a safer environment for those cycling along the road;
  • Provides a lane for emergency vehicles.

For the reasons above, the bus lane is operational 24 hours a day and the majority of bus lanes in Norfolk operate on this basis.  These benefits are greatest at peak times of the day when the transport network is at its busiest, but benefits are still realised throughout the remainder of the day. If restrictions are changed to allow general traffic to use the bus lane, the benefits that bus lanes bring would be substantially reduced or removed altogether.  Additionally, this would create a dual carriageway environment in this area where traffic is likely to speed up and exceed the speed limit.  Delays to general traffic are minimised by stopping the bus lane short of busy junctions.

The County Council has secured funding through the Transforming Cities Fund (TCF), which has the aim of delivering clean transport priority corridors linking economic growth areas with existing and future housing and educational provision.  Dereham Road is one of these corridors and TCF proposals along various sections of Dereham Road are aimed at encouraging more people to use public transport, walk and cycle.  First Bus are investing £18m in the provision of new buses and bus service enhancements as part of their commitment to the TCF programme, which includes new buses and a weekday service of up to 10 buses per hour for the Red line service along Dereham Road.  This investment is based around improvements to journey time reliability and journey time savings that can only be delivered through existing and proposed bus priority measures, including bus lanes, being in place and operational all of the time.

For the above reasons, the Council does not propose to remove or alter the timings for this important bus and cycle priority measure.

DateUserDescriptionStatus
 Page 1 of 34, items 1 to 10 of 337.
15/02/2021 10:22 SG BSU Response PublishedResponse Published
15/02/2021 10:17 SG BSU Response ApprovedResponse Published
10/02/2021 15:14(System Event) - Data Removed - Response Awaiting Approval
16/01/2021 05:36(System Event) - Data Removed - Response Pending
16/01/2021 05:36(System Event) - Data Removed - Response Pending
18/12/2020 22:03(System Event) - Data Removed - Petition Active
11/12/2020 16:37(System Event) - Data Removed - Petition Active
29/10/2020 09:00(System Event) - Data Removed - Petition Active
21/10/2020 19:17(System Event) - Data Removed - Petition Active
21/10/2020 06:54(System Event) - Data Removed - Petition Active

Search Petitions